A look at recent civil engineering and infrastructure projects across the UK’s renewable energy sector — the scale, the figures and the work behind them.

A full trenching and cable-installation package — 12 km+ of trenching, MV and LV cable, fibre and road crossings.
View project →
Archaeological strip and trenching works, carried out alongside site archaeologists ahead of construction.
Get in touch →
Foundations and the site road network — foundation excavation, reinforced bases, haul roads and access trackways.
View project →
Full civils for a solar and 20.7MWh vanadium flow battery hub — roads, drainage, two balancing ponds, foundations, ducting and reinstatement.
View project →