PROJECT
Copwood VFB Energy Hub
- East Sussex
HWBC delivered the full civil engineering package for the Copwood VFB Energy Hub, a pioneering renewable energy development combining solar generation with long-duration battery storage.
Our works included site establishment, road construction, drainage infrastructure, balancing ponds, ducting networks, reinforced concrete foundations, earthing systems, CCTV infrastructure and final reinstatement works.
20.7MWh
VANADIUM FLOW BATTERY STORAGE
181
Chambers & Manholes
3450t+
Materials Imported
3.2km
ducting and pipework
118
Supastack Chambers
The Project
The Copwood VFB Energy Hub is a pioneering renewable energy development in East Sussex, combining utility-scale solar generation with long-duration vanadium flow battery technology. Once operational, the facility will become Europe’s largest vanadium flow battery installation and a flagship project for energy storage in the UK.
HWBC was appointed to deliver the full civil engineering package across the development. Our involvement commenced with site establishment works, including compound installation, vegetation management and enabling works.
We subsequently delivered the infrastructure required to support both the solar farm and battery energy storage facility, including access roads, reinforced concrete foundations, ducting networks, earthing systems, CCTV infrastructure and associated civil engineering works.
In addition, HWBC constructed two balancing ponds and a comprehensive drainage network designed to provide controlled discharge into the local watercourse in accordance with the approved drainage strategy.
Following completion of the infrastructure works, our team undertook reinstatement activities across the site, ensuring all areas were restored in accordance with project requirements.
Scope of Works
- Site Establishment & Compound Installation
- Vegetation Clearance & Grass Cutting
- Battery Energy Storage Facility Civil Engineering Works
- Solar Farm Infrastructure Works
- MPVS Reinforced Foundation Installation
- Battery & Solar Ducting Network Installation
- Earthing & Grounding Systems
- CCTV Infrastructure & Foundations
- Drainage Infrastructure Balancing ponds
- Watercourse Connection Works
- Site Reinstatement Works
Project Information
Project Type
Solar Farm & Battery Energy Storage Infrastructure
Location
East Sussex
Services Delivered
Civil Engineering & Infrastructure Works
Drainage Infrastructure
Balancing Ponds & Site-wide Drainage Network
Site Features
Solar Farm & 20.7MWh Vanadium Flow Battery Facility
Contract Scope
Full Civil Engineering Package
Delivery
From Site Establishment to Reinstatement
Outcome
The civil engineering package was successfully completed, providing the infrastructure necessary to support one of the UK’s most significant renewable energy and long-duration energy storage developments.
From site establishment and enabling works through to drainage, balancing ponds, foundations, ducting infrastructure and reinstatement, HWBC delivered a coordinated civil engineering solution that supported the successful construction of the Copwood VFB Energy Hub.
The project demonstrates HWBC’s capability to deliver complex renewable energy infrastructure schemes combining solar generation, battery energy storage and environmental engineering works within a single integrated package.